Downtown Franklin's New Condos and Townhomes, From Fifth Avenue to Winstead Hill

"For development to move forward infrastructure must be first." A Boyle Investment Company representative said that to Franklin's Board of Mayor and Aldermen on April 28, 2026, the night the former Harlin farm passed its final reading, as the Williamson Herald reported. It was Boyle's own description of how its plan is phased, and the phasing sets the timing for the new housing near downtown Franklin that comes closest to what a downsizer has in mind: brownstones and condominium flats with elevator access, set in a walkable hamlet.

A downsizer can buy into downtown's new construction today, but only at the top of the scale. On Columbia Avenue, just south of Main Street, the condos being built start just above $2.4 million. The more moderate formats are planned farther south, in a community whose first phase is scheduled for 2027 to 2029. Anyone hoping to move into something smaller and walkable in the next two years is mostly choosing among homes that already exist, and the new projects set the price ceiling and the calendar for that choice.

The projects below run in order down the map, from the north side of downtown to the city's southern edge.

Fifth Avenue North: the lower end of the price scale

The smallest project is also the closest to the historic core. On Feb. 10, 2026, the Board of Mayor and Aldermen voted unanimously to commit up to $3.5 million toward Bousquet Place, also called the Hill Property. It is planned for up to 44 workforce and affordable homes at 403 and 405 5th Ave. N. The Williamson Herald's coverage of the vote explains that the city money covers the gap between what the homes are expected to sell for and what they cost to build. A revised design discussed by the board split the 44 homes into 34 workforce multiplex homes and 10 affordable homes.

Together with the next project down the map, Bousquet Place shows that new for-sale construction near downtown is coming in at both ends of the price scale, a few blocks apart.

The 700 and 800 blocks of Columbia Avenue: the new top of the market

The Margin District covers the 700 and 800 blocks of Columbia Avenue. It is a 180,000-square-foot mixed-use project owned by Arlington Family Offices and developed by NAI Nashville Stanton Group. According to the Williamson Herald, the residential part has 23 luxury condominiums, and the developer says six of them have sold. The homes run from 2,000 to more than 3,000 square feet. Each has a private terrace, two spaces in a gated garage and about 100 square feet of private storage. There is also a separate flagship residence of 5,737 square feet, priced at $6.85 million.

From a design standpoint, this building is meant to read as Franklin. The plans call for brick, stepped rooflines, gabled dormers, millwork and antiqued brass. The old Handy Hardware building is being restored and reused as part of the project. Studio 8 Design is the lead architect, Nequette Architecture & Design is the residential architect, American Constructors is the general contractor and Davis Properties is building the residences.

Both the price and the schedule have moved since launch. When the project was announced in November 2024, Williamson Source reported 25 homes with reservations starting just above $2 million and delivery in 2027. The current marketing gives a starting price just above $2.4 million, and the Herald now reports completion between the fourth quarter of 2027 and the first quarter of 2028. Construction started in June 2025, and on Nov. 5, 2026, NewsChannel 5 reported that cranes are expected on the two-block site for about another year.

Compared with the county, a starting price just above $2.4 million is about two and a half times Williamson County's September 2026 median sale price of $950,000, according to Greater Nashville Realtors. It is more than five times the $460,000 median for Williamson County condos that sold from July through September 2026. The Margin District is a new price tier for downtown condos, well above where most of the existing condo market sits.

926 Columbia Avenue: townhomes in a concept plan

A few blocks south, H.G. Hill Realty Company presented a redevelopment concept for 926 Columbia Ave. in July 2025. As described in the Williamson County Chamber's release, it includes a four-story, 120-key hotel, a three-story mixed-use building with underground parking and three-story townhome buildings. The address later came up for discussion at a joint workshop of the Board of Mayor and Aldermen and the Planning Commission.

Three-story townhomes put a downsizer's daily routine on stairs. For anyone who wants the primary suite on the main level, a walkable address does not make up for a home that is harder to live in. That trade-off is worth weighing on any vertical floor plan, and our guide to reading new-construction floor plans in Franklin covers how to test a layout against how you actually live.

Below Winstead Hill: the middle-priced formats, on a phased schedule

At the southern end of Columbia Avenue, below Winstead Hill where Franklin's city limits end, is the 311-acre Harlin farm. Boyle Investment Company is developing it as Asbury. Boyle describes the housing as the "Missing Middle" that Franklin residents have long asked for. The plan is a walkable hamlet with single-family homes styled after downtown Franklin, brownstones and condominium flats with elevator access, surrounded by lots of two to eight acres.

The approved plan includes 249 residences, 32,000 square feet of commercial space, 6.5 miles of walking and biking trails and an 80-key hotel. On April 28, the board voted 6-2 on the plan of services, 5-3 to annex the land, 6-2 to zone it Planned District and 5-3 to approve the development plan.

At that meeting, Boyle's representative laid out two phases: Phase 1 from 2027 to 2029 and Phase 2 from 2029 to 2030. City staff said the bid for Columbia Avenue construction is scheduled to go out in late 2027. Williamson Source reports that construction is expected to begin in early 2027, with roadway improvements planned before each phase opens.

Of everything on this list, elevator-served flats are the format built most directly for a long-term, single-level home. In Asbury, they are part of a community whose first homes are on a schedule that begins in 2027 and runs through 2030.

The timeline, and what it means for a move in the next two years

Project Location Housing Price as reported Timing as reported
Bousquet Place 403 and 405 5th Ave. N. Up to 44 workforce and affordable homes City commitment of up to $3.5 million Funding approved Feb. 10, 2026
The Margin District 700 and 800 blocks of Columbia Ave. 23 condos plus a flagship residence From just above $2.4 million; flagship $6.85 million Completion Q4 2027 to Q1 2028
H.G. Hill concept 926 Columbia Ave. Three-story townhome buildings, mixed-use building, hotel Concept stage Discussed at a joint city workshop
Asbury 1247 Hillview Lane, below Winstead Hill Downtown-style homes, brownstones, elevator flats, estate lots Concept stage Phase 1 2027 to 2029; Phase 2 2029 to 2030

Read across the rows, the table shows that the only new walkable condo with a delivery window that opens in late 2027 is priced above $2.4 million. For most downsizers, a move in the next two years means buying an existing condo, townhome or smaller house. Across Williamson County, condos that sold from July through September 2026 had a median price of $460,000, while the residential median was $1,075,000.

Current conditions favor that buyer. In its Nov. 15 market update, Greater Nashville Realtors reported that pending sales across its nine-county region fell 21 percent in October 2026 and closings fell 12 percent. It also said many sellers are lowering asking prices or offering concessions.

The home a downsizer is selling is in a steadier segment. Regionally, closings in the third quarter of 2026 rose only for homes priced at $1 million and above, and every lower price range declined. Williamson County's September closings rose 4 percent and its median price rose 2 percent from the year before.

For a downsizer selling a larger Williamson County home and buying an existing condo near downtown, this winter's market works in both directions. The sale is in the stronger segment, and the purchase is in a market where buyers have room to negotiate. The new projects matter mostly as a guide to timing. They show what will open, roughly when, and what the newest downtown condos cost. They also offer some context for anyone weighing an older home in or near the historic district.

A few quick answers

Are the Margin District residences for sale or for rent? They are for-sale condominiums. Williamson Source described them that way at the 2024 launch, and they are still marketed that way.

When could someone live in Asbury? Construction is expected to start in early 2027. Boyle's representative told the board that Phase 1 runs from 2027 to 2029.

Is Asbury downtown? No. It is at the southern edge of the city, below Winstead Hill. Its developer describes it as minutes from Downtown Franklin, and the walkable streets are planned inside the community itself.

For a downsizer, the timing of any of these moves starts with one figure: what your current home would sell for in this fall's market. Susan Salazar can prepare that number with you, compare it with the existing condos and townhomes near downtown Franklin, and help you decide whether to buy now or wait for the new projects. Start with a free home valuation.